We have now completed and tested the noise control measures on the 2mW generator installation at More London, Tooley Street, London to everyone’s satisfaction. The generator was load tested and the noise levels were met both inside the building and at road level where the cooling air discharges.

We have also completed pump enclosures and carried out the site noise surveys for Acciona/Thames Water on the new desalination site in East London. On this site we enclosed 24off large Flowserve pumps in the main Reverse Osmosis Building.